China

China

Go back to list

April 2018

For the re-positioning of the water network in Chuang Xin Zhi street in Shanghai, and on behalf of Shanghai Engineering Construction Consulting Co. Ltd, GPS (a SADE subsidiary) will be laying 1,849m of cast-iron pipes (150mm, 200mm, 300mm, 500mm, 800mm and 1000mm-diameter).

Go back to list

Focus on Burkina Faso

Focus on TPM

SADE - 23-25 av. du Docteur Lannelongue - CS 51450 - 75685 Paris Cedex 14