China

China

Go back to list

June 2019

In Shanghai, for the development of the Jihai wastewater treatment plant and the building of the Jinyue Road metro station (line 14), GPS (a SADE subsidiary), on behalf of Shanghai Pudong Water, will be laying 677m of 1,600mm-diameter cast-iron and steel pipes.

Go back to list

Focus on Burkina Faso

Focus on TPM

SADE - 23-25 av. du Docteur Lannelongue - CS 51450 - 75685 Paris Cedex 14