• fr
  • en
  • es
  • Fr
  • En
  • Es
x
Logo
  • In brief
    • Profile
      • Key figures
      • Governance and Ethics
      • Certifications
    • Anchoring
      • International
      • France
    • Path
  • Business lines
    • Networks
      • Water
      • Energy
    • Infrastructure
      • Civil engineering
      • Underground works
  • Services and Solutions
    • Regional authorities
    • Industries
    • Major infrastructures
  • CSR: A Conviction
  • Innovation
  • References
  • Careers
    • Proud to be a pro at SADE
    • Job application
  • News
    • Current projects
  • Contact
  • En
    • Fr
    • Es
recherche
  • Fr
  • En
  • Es

Current projects

Back to all projects

Improving a municipality’s drainage network

The Loire-Forez conglomeration entrusted the SADE Group with the separation of a sewer mains section in the Saint-Just-Saint-Rambert municipality. Works were co-contracted by the local SADE agency and DPSM, our Toulouse-based subsidiary and rehabilitation expert.

Double, rehabilitate and separate

Along around 450m on Avenue des Barques, the task was to:

  • Rehabilitate a T180 ovoid
  • Build a stormwater collector in parallel (800mm-diameter concrete)
  • Create/modify all branch connections to separate stormwater and wastewater drainage along most of this section

The DPSM teams took care of the rehabilitation, while the Poitiers-Metz RD, and more specifically the Saint-Etienne branch (Montagny Agency), saw to the creation of the new collector, at 2.5m to 4.5m deep, with ad hoc branch connections.

Disorders to be repaired in order

The existing ovoid, a mechanically structuring element, presented numerous leakage points, due to cracks or embedded roots, which all had to be methodically dealt with.

Step one: securing

In addition to its drying out by 200m³/hour pumping and rerouting mounted in corbelling, this segment of the combined collector, highly sensitive to rising stormwater, was secured by 2 automated water-level control points with an alarm. In addition, a subscription to the French meteorological alert service and close contact with the operators of an upstream dam were put in place. Such precautions are useful all year round, and more particularly during the works last summer.

Step two: rehabilitation

The DPSM team then proceeded to the actual rehabilitation of the ovoid, i.e. 

  • Repairs to 207 specific points by purging, followed by wet spraying of H2S-resistant mortar
  • The pouring of an apron all along the section, and repairs to the right and left legs of the structure at a height of 50cm with the same mortar
  • Waterproofing of the facility and branch connections

The birth of a co-contract

When the call for tender was launched by the local authority, and given the specificity of the required rehabilitation operations, the Poitiers-Metz RD naturally opted to co-contract this order with DPSM, for its successful outcome. A wonderful example of stronger together and collective intelligence!

CONTACT

Upcoming project? Ongoing worksite? Urgent work that needs to be done? Technical issue? Support request? Do you just need some advice or information, or perhaps you’ve got an improvement to suggest? Click here and we’ll quickly get back to you!

FOLLOW US

23-25 av. du Docteur Lannelongue
75014 Paris

  • IN BRIEF
    • Profile
    • Anchoring
    • Path
  • PROFESSIONS
    • Systems
    • Infrastructure
  • SERVICES & SOLUTIONS
    • Regional authorities
    • Industries
    • Major infrastructures
  • REFERENCES
  • CSR
  • APPLICATIONS
  • NEWS
  • CONTACT

Legal notice Ι Anticorruption code of conduct Ι Occupational gender equality index Ι Personal Data Protection Policy Ι Suppliers relationship © 2021 All rights reserved

23-25 av. du Docteur Lannelongue
75014 Paris

  • IN BRIEF
    • Profile
    • Anchoring
    • Path
  • PROFESSIONS
    • Systems
    • Infrastructure
  • SERVICES & SOLUTIONS
    • Regional authorities
    • Industries
    • Major infrastructures
  • REFERENCES
  • CSR
  • APPLICATIONS
  • NEWS
  • CONTACT

Legal notice Ι Anticorruption code of conduct Ι Occupational gender equality index Ι Personal Data Protection Policy Ι Suppliers relationship © 2021 All rights reserved

Fraud Warning

It has come to our attention that emails have been sent by individuals falsely claiming to be SADE employees. The objective of these emails is to place false orders using our company’s name. Read more…

In the emails detected to date, the fraudsters are writing from the addresses “[email protected]” or “[email protected]”. They use our logo and Paris 75014 address.

We wish to draw your attention to the fact that these email addresses do not correspond to SADE’s email address, which bears the domain name sade-cgth.fr.

We thus advise caution in your communication and request that you do not exchange documents or information with persons other than your usual contacts at SADE. If you are in any doubt, we advise you to speak to your usual contacts prior to the transmission of any document or information.

As fraudsters regularly change their operating mode, we also recommend you alert all your employees likely to have dealings in this area (purchasing, accounting or payroll, etc.).

SADE systematically lodges an official complaint in response to such acts. We would be grateful if you could notify us at the following address of any contact you may have had with individuals claiming to be employees of our company: [[email protected]]